NASA NTRS ยท 19860019939
Advanced on-site power plant development technology program
Abstract
A 30-cell stack was tested for 7200 hours. At 6000 hours the stack was successfully refilled with acid with no loss of performance. A second stack containing the advanced Configuration B cell package was fabricated and assembled for testing in 1985. A 200-kW brassboard inverter was successfully evaluated, verifying the design of the two-bridge ASCR circuit design. A fuel processing catalyst train was tested for 2000 hours verifying the catalyst for use in a 200-kW development reformer. The development reformer was fabricated for evaluation in 1985. The initial test plan was prepared for a 200-kW verification test article.
Keep this discovery
Explore connections, maps & timelines
Kemp, F. S.. 1985-02-01. Advanced on-site power plant development technology program. https://ntrs.nasa.gov/citations/19860019939
Cite the original work for its findings. Save a collection to share your selection of sources.