Orbital transfer vehicle launch operations study. Volume 2: Detailed summary
Abstract
A series of Operational Design Drivers were identified. Several of these could have significant impact(s) on program costs. These recommendations, for example, include such items as: complete factory assembly and checkout prior to shipment to the ground launch site to make significant reductions in time required at the launch site as well as overall manpower required to do this work; minimize use of nonstandard equipment when orbiter provided equipment is available; and require commonality (or interchangeability) of subsystem equipment elements that are common to the space station, Orbit Maneuvering Vehicles, and/or Orbit Transfer Vehicles. Several additional items were identified that will require a significant amount of management attention (and direction) to resolve. Key elements of the space based processing plans are discussed.
Keep this discovery
Explore connections, maps & timelines
1986-03-07. Orbital transfer vehicle launch operations study. Volume 2: Detailed summary. https://ntrs.nasa.gov/citations/19870000678
Cite the original work for its findings. Save a collection to share your selection of sources.