NASA NTRS ยท 19870009158
DACC program cost and work breakdown structure-dictionary. General purpose aft cargo carrier study, volume 2
Abstract
Results of detailed cost estimates and economic analysis performed on the updated 201 configuration of the dedicated Aft Cargo Carrier (DACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the DACC on the Space Transportation System (STS). The detailed cost estimates for the DACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/DACC launch vehicle cost impacts for delivering an orbital transfer vehicle to a 120 NM low Earth orbit (LEO).
Keep this discovery
Explore connections, maps & timelines
1985-05-01. DACC program cost and work breakdown structure-dictionary. General purpose aft cargo carrier study, volume 2. https://ntrs.nasa.gov/citations/19870009158
Cite the original work for its findings. Save a collection to share your selection of sources.