NASA NTRS ยท 19900009934
Operational requirements and the geostationary platform
Abstract
For 22 years (from ATS-1 to GOES-H) a single technology has dominated imaging from geosynchronous altitudes. In 1990, with the scheduled launch of GOES-I, a major change will occur which will in turn open the way for the Geostationary Platform. The need for improved observations of severe storms has led NOAA to a decision to replace spinning geostationary spacecraft with a three-axis-stabilized type (non-spinning) vehicle already common among communications spacecraft and demonstrated by INSAT. Also, the current spin-scan imager with sounder channels will be replaced by separate instruments capable of independent aiming. The advantages and challenges of the changes are discussed.
Keep this discovery
Explore connections, maps & timelines
Sparkman, James K., Jr.. 1989-07-01. Operational requirements and the geostationary platform. https://ntrs.nasa.gov/citations/19900009934
Cite the original work for its findings. Save a collection to share your selection of sources.