NASA NTRS ยท 19910011917
Flight set 360L007 (STS-33) insulation component. Volume 3: Final release
Abstract
Volume 3 of this postfire report deals with the insulation component of the RSRM. The report is released twice for each flight set. The interim release contract date is on or before 60 days after the last field joint or nozzle to case joint is disassembled at KSC and contain the results of the KSC visual evaluation. The data contained in Volume 3 interim release supersedes the insulation data presented in the KSC 10 day report. The final release contract data is on or before 60 days after the last factory joint is disassembled at the Clearfield H-7 facility and contains the results of all visual evaluations and a thermal safety factor analysis. The data contained in the Volume 3 final release supersedes the interim release and the insulation data presented in the Clearfield 10 day report.
Keep this discovery
Explore connections, maps & timelines
Hicken, Steve. 1990-08-01. Flight set 360L007 (STS-33) insulation component. Volume 3: Final release. https://ntrs.nasa.gov/citations/19910011917
Cite the original work for its findings. Save a collection to share your selection of sources.