NASA NTRS ยท 19920005374
Appendices B thru F, volume 3
Abstract
The purpose of this investigation was to determine if the intermodule ventilation (IMV) systems and water distribution systems of Space Station Freedom (SSF) modules and nodes should be connected as they are interfaced with those already in operation. It was concluded that the AC configuration and attached LAB and HAB modules and nodes should be interconnected. The H2O circuits should also be interconnected. Interconnecting the air and water provides flexibility of operation and safety comparable to the Assembly Complete (AC) configuration. This requires only only that valves and ducts be provided in the AC nodes. The AC node interfaces should also be scarred to provide for water transfer across these interfaces. Penalties for not connecting the Intermodular Ventilation (IMV) system and water circuits include an additional AR unit, possible increased water storage requirements, and considerable reduction in crew flexibility.
Keep this discovery
Explore connections, maps & timelines
1991-09-03. Appendices B thru F, volume 3. https://ntrs.nasa.gov/citations/19920005374
Cite the original work for its findings. Save a collection to share your selection of sources.