Operations mission planner beyond the baseline
Abstract
The scheduling of Space Station Freedom must satisfy four major requirements. It must ensure efficient housekeeping operations, maximize the collection of science, respond to changes in tasking and available resources, and accommodate the above changes in a manner that minimizes disruption of the ongoing operations of the station. While meeting these requirements the scheduler must cope with the complexity, scope, and flexibility of SSF operations. This requires the scheduler to deal with an astronomical number of possible schedules. The Operations Mission Planner (OMP) is centered around minimally disruptive replanning and the use of heuristics limit search in scheduling. OMP has already shown several artificial intelligence based scheduling techniques such as Interleaved Iterative Refinement and Bottleneck Identification using Process Chronologies.
Keep this discovery
Explore connections, maps & timelines
Biefeld, Eric, Cooper, Lynne. 1991-09-01. Operations mission planner beyond the baseline. https://ntrs.nasa.gov/citations/19920008135
Cite the original work for its findings. Save a collection to share your selection of sources.