Search NASAโŒ• Search

NASA NTRS ยท 19920015896

Spiral model pilot project information model

Abstract

The objective was an evaluation of the Spiral Model (SM) development approach to allow NASA Marshall to develop an experience base of that software management methodology. A discussion is presented of the Information Model (IM) that was used as part of the SM methodology. A key concept of the SM is the establishment of an IM to be used by management to track the progress of a project. The IM is the set of metrics that is to be measured and reported throughout the life of the project. These metrics measure both the product and the process to ensure the quality of the final delivery item and to ensure the project met programmatic guidelines. The beauty of the SM, along with the IM, is the ability to measure not only the correctness of the specification and implementation of the requirements but to also obtain a measure of customer satisfaction.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1991-10-28. Spiral model pilot project information model. https://ntrs.nasa.gov/citations/19920015896

Cite the original work for its findings. Save a collection to share your selection of sources.