Search NASAโŒ• Search

NASA NTRS ยท 19930008127

Development of vendor evaluation criteria and post-implementation considerations for MSFC center-wide executive information system

Abstract

In June 1991, the MITRE Corporation submitted a series of recommendations as part of a Marshall Space Flight Center (MSFC) Management Information System Requirements Study, initiated by the Information Systems Office (ISO). A major recommendation of the study was to develop an Executive Information System (EIS) for MSFC executives. ISO was directed, by center management, to proceed with the development of a Center-Wide Executive Information System. Existing EIS prototypes, developed by the Space Shuttle Projects Office and the Payload Projects Office, were reviewed. These existing MSFC prototypes were considered not to encompass the required functionality needed on a center-wide basis. A follow-up study by MITRE provided top-level system requirements. These were later incorporated into a final requirements specification document by Boeing Computer Support Services.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Moynihan, Gary P.. 1992-12-01. Development of vendor evaluation criteria and post-implementation considerations for MSFC center-wide executive information system. https://ntrs.nasa.gov/citations/19930008127

Cite the original work for its findings. Save a collection to share your selection of sources.