NASA NTRS · 19930008780
Spacecraft design project: Low Earth orbit communications satellite
Abstract
This is the final product of the spacecraft design project completed to fulfill the academic requirements of the Spacecraft Design and Integration 2 course (AE-4871) taught at the U.S. Naval Postgraduate School. The Spacecraft Design and Integration 2 course is intended to provide students detailed design experience in selection and design of both satellite system and subsystem components, and their location and integration into a final spacecraft configuration. The design team pursued a design to support a Low Earth Orbiting (LEO) communications system (GLOBALSTAR) currently under development by the Loral Cellular Systems Corporation. Each of the 14 team members was assigned both primary and secondary duties in program management or system design. Hardware selection, spacecraft component design, analysis, and integration were accomplished within the constraints imposed by the 11 week academic schedule and the available design facilities.
Keep this discovery
Explore connections, maps & timelines
Moroney, Dave, Lashbrook, Dave, Mckibben, Barry, Gardener, Nigel, Rivers, Thane, Nottingham, Greg, Golden, Bill, Barfield, Bill, Bruening, Joe, Wood, Dave. 1991-12-01. Spacecraft design project: Low Earth orbit communications satellite. https://ntrs.nasa.gov/citations/19930008780
Cite the original work for its findings. Save a collection to share your selection of sources.