Search NASASearch

NASA NTRS · 19930009490

Rescheduling with iterative repair

Abstract

This paper presents a new approach to rescheduling called constraint-based iterative repair. This approach gives our system the ability to satisfy domain constraints, address optimization concerns, minimize perturbation to the original schedule, and produce modified schedules quickly. The system begins with an initial, flawed schedule and then iteratively repairs constraint violations until a conflict-free schedule is produced. In an empirical demonstration, we vary the importance of minimizing perturbation and report how fast the system is able to resolve conflicts in a given time bound. These experiments were performed within the domain of Space Shuttle ground processing.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Zweben, Monte, Davis, Eugene, Daun, Brian, Deale, Michael. 1992-05-01. Rescheduling with iterative repair. https://ntrs.nasa.gov/citations/19930009490

Cite the original work for its findings. Save a collection to share your selection of sources.