NASA NTRS · 19930010247
A model for the cost of doing a cost estimate
Abstract
A model for estimating the cost required to do a cost estimate for Deep Space Network (DSN) projects that range from $0.1 to $100 million is presented. The cost of the cost estimate in thousands of dollars, C(sub E), is found to be approximately given by C(sub E) = K((C(sub p))(sup 0.35)) where C(sub p) is the cost of the project being estimated in millions of dollars and K is a constant depending on the accuracy of the estimate. For an order-of-magnitude estimate, K = 24; for a budget estimate, K = 60; and for a definitive estimate, K = 115. That is, for a specific project, the cost of doing a budget estimate is about 2.5 times as much as that for an order-of-magnitude estimate, and a definitive estimate costs about twice as much as a budget estimate. Use of this model should help provide the level of resources required for doing cost estimates and, as a result, provide insights towards more accurate estimates with less potential for cost overruns.
Keep this discovery
Explore connections, maps & timelines
Remer, D. S., Buchanan, H. R.. 1992-08-15. A model for the cost of doing a cost estimate. https://ntrs.nasa.gov/citations/19930010247
Cite the original work for its findings. Save a collection to share your selection of sources.