Search NASAโŒ• Search

NASA NTRS ยท 19930012813

Space Station ECLSS Integration Analysis

Abstract

The Space Station Environmental Control and Life Support System (ECLSS) contract with NASA MSFC covered the time frame from 9 May 1985 to 31 Dec. 1992. The contract roughly covered the period of Space Station Freedom (SSF) development from early Phase B through Phase C/D Critical Design Review (CDR). During this time, McDonnell Douglas Aerospace-Huntsville (formerly McDonnell Douglas Space Systems Company) performed an analytical support role to MSFC for the development of analytical math models and engineering trade studies related to the design of the ECLSS for the SSF.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1993-01-01. Space Station ECLSS Integration Analysis. https://ntrs.nasa.gov/citations/19930012813

Cite the original work for its findings. Save a collection to share your selection of sources.