Search NASAโŒ• Search

NASA NTRS ยท 19930014048

Space Station Furnace Facility. Volume 3: Program cost estimate

Abstract

The approach used to estimate costs for the Space Station Furnace Facility (SSFF) is based on a computer program developed internally at Teledyne Brown Engineering (TBE). The program produces time-phased estimates of cost elements for each hardware component, based on experience with similar components. Engineering estimates of the degree of similarity or difference between the current project and the historical data is then used to adjust the computer-produced cost estimate and to fit it to the current project Work Breakdown Structure (WBS). The SSFF Concept as presented at the Requirements Definition Review (RDR) was used as the base configuration for the cost estimate. This program incorporates data on costs of previous projects and the allocation of those costs to the components of one of three, time-phased, generic WBS's. Input consists of a list of similar components for which cost data exist, number of interfaces with their type and complexity, identification of the extent to which previous designs are applicable, and programmatic data concerning schedules and miscellaneous data (travel, off-site assignments). Output is program cost in labor hours and material dollars, for each component, broken down by generic WBS task and program schedule phase.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1992-05-01. Space Station Furnace Facility. Volume 3: Program cost estimate. https://ntrs.nasa.gov/citations/19930014048

Cite the original work for its findings. Save a collection to share your selection of sources.