NASA NTRS · 19940007096
In-space operations for lunar and Mars space transfer vehicles
Abstract
The objective of this paper is to discuss the in-space operations required to process the lunar and Mars mission vehicles envisioned for the Space Exploration Initiative (SEI). Recent studies, which have examined the degree to which on-orbit operations change as a function of the Earth-to-orbit (ETO) launch vehicle size, identified a common set of on-orbit vehicle processing tasks, and generated functional requirements for in-space processing nodes are summarized in this paper. Timelines for on-orbit processing of two different lunar transfer vehicles (LTV's) were developed to compare a 'current practice,' labor-intensive EVA approach to ones utilizing telerobotics and advanced automation. LTV aerobrake concepts ranging from simple deployment to considerable assembly are compared. Similar timelines for the on-orbit processing of a nuclear Mars transfer vehicle (MTV) are also presented. Aerobrakes can be processed in a timely manner and should not be ruled out for SEI missions. The 'tall pole' time interval for on-orbit vehicle initial processing is the delivery of elements to orbit, not the processing tasks.
Keep this discovery
Explore connections, maps & timelines
Raper, James L., Sr., Vargo, Rick C.. 1993-02-01. In-space operations for lunar and Mars space transfer vehicles. https://ntrs.nasa.gov/citations/19940007096
Cite the original work for its findings. Save a collection to share your selection of sources.