NASA NTRS · 19940019441
Representing operations procedures using temporal dependency networks
Abstract
DSN Link Monitor & Control (LMC) operations consist primarily of executing procedures to configure, calibrate, test, and operate a communications link between an interplanetary spacecraft and its mission control center. Currently the LMC operators are responsible for integrating procedures into an end-to-end series of steps. The research presented in this paper is investigating new ways of specifying operations procedures that incorporate the insight of operations, engineering, and science personnel to improve mission operations. The paper describes the rationale for using Temporal Dependency Networks (TDN's) to represent the procedures, a description of how the data is acquired, and the knowledge engineering effort required to represent operations procedures. Results of operational tests of this concept, as implemented in the LMC Operator Assistant Prototype (LMCOA), are also presented.
Keep this discovery
Explore connections, maps & timelines
Fayyad, Kristina E., Cooper, Lynne P.. 1993-03-01. Representing operations procedures using temporal dependency networks. https://ntrs.nasa.gov/citations/19940019441
Cite the original work for its findings. Save a collection to share your selection of sources.