Search NASA⌕ Search

NASA NTRS · 19940019495

Estimating the Deep Space Network modification costs to prepare for future space missions by using major cost drivers

Abstract

This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The paper focuses on the costs required to modify and/or enhance the DSN to prepare for future space missions. The model is a function of eight major mission cost drivers and estimates both the total cost and the annual costs of a similar future space mission. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Estimates derived from the model are tested against actual cost data for two independent missions, Viking and Mariner Jupiter/Saturn (MJS).

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Remer, Donald S., Sherif, Josef, Buchanan, Harry R.. 1993-03-01. Estimating the Deep Space Network modification costs to prepare for future space missions by using major cost drivers. https://ntrs.nasa.gov/citations/19940019495

Cite the original work for its findings. Save a collection to share your selection of sources.