Task 4 supporting technology. Densification requirements definition and test objectives. Propellant densification requirements definition

Abstract

The primary challenge of the X-33 CAN is to build and test a prototype LO2 and LH2 densification ground support equipment (GSE) unit, and perform tank thermodynamic testing within the 15 month phase 1 period. The LO2 and LH2 propellant densification system will be scaled for the IPTD LO2 and LH2 tank configurations. The IPTD tanks were selected for the propellant technology demonstration because of the potential benefits to the phase 1 plan: tanks will be built in time to support thermodynamic testing; minimum cost; minimum schedule risk; future testing at MSFC will build on phase 1 data base; and densification system will be available to support X-33 and RLV engine test at IPTD. The objective of the task 1 effort is to define the preliminary requirements of the propellant densification GSE and tank recirculation system. The key densification system design parameters to be established in Task 1 are: recirculation flow rate; heat exchanger inlet temperature; heat exchanger outlet temperature; maximum heat rejection rate; vent flow rate (GN2 and GH2); densification time; and tank pressure level.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Lak, Tibor, Weeks, D. P.. 1995-05-30. Task 4 supporting technology. Densification requirements definition and test objectives. Propellant densification requirements definition. https://ntrs.nasa.gov/citations/19950021839

Cite the original work for its findings. Save a collection to share your selection of sources.