NASA NTRS · 19970009775
Predictive Engineering Implementation at KSC
Abstract
This paper provides an overview of what the primary contractors at Kennedy Space Center (KSC) are doing in the field of predictive engineering. The technologies employed by each of the contractors and the cost savings associated with the implementation of these predictive engineering methods are discussed. The sources include predictive engineering implementation plans, published by each of the contractors and interviews with the authors of these implementation plans.
Keep this discovery
Explore connections, maps & timelines
Mosconi, Jane, Schafer, Loraine. 1995-01-01. Predictive Engineering Implementation at KSC. https://ntrs.nasa.gov/citations/19970009775
Cite the original work for its findings. Save a collection to share your selection of sources.