A Case Study of 4 & 5 Cost Effectiveness

Abstract

This paper looks at the Independent Verification and Validation (IV&V) of NASA's Space Shuttle Day of Launch I-Load Update (DoLILU) project. IV&V is defined. The system's development life cycle is explained. Data collection and analysis are described. DoLILU Issue Tracking Reports (DITRs) authored by IV&V personnel are analyzed to determine the effectiveness of IV&V in finding errors before the code, testing, and integration phase of the software development life cycle. The study's findings are reported along with the limitations of the study and planned future research.