Search NASA⌕ Search

NASA NTRS · 19990062659

Spares Management : Optimizing Hardware Usage for the Space Shuttle Main Engine

Abstract

The complexity of the Space Shuttle Main Engine (SSME), combined with mounting requirements to reduce operations costs have increased demands for accurate tracking, maintenance, and projections of SSME assets. The SSME Logistics Team is developing an integrated asset management process. This PC-based tool provides a user-friendly asset database for daily decision making, plus a variable-input hardware usage simulation with complex logic yielding output that addresses essential asset management issues. Cycle times on critical tasks are significantly reduced. Associated costs have decreased as asset data quality and decision-making capability has increased.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Gulbrandsen, K. A.. 1999-01-01. Spares Management : Optimizing Hardware Usage for the Space Shuttle Main Engine. https://searchnasa.com/record/nasa%3A19990062659/spares-management-optimizing-hardware-usage-for-the-space-shuttle-main-engine

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.