Search NASAโŒ• Search

NASA NTRS ยท 20000012423

STS-26 Preflight Press Briefing: Shuttle Systems Changes (2)

Abstract

This NASA KSC video release presents part of a press conference held prior to Discovery flight STS-26, the first shuttle mission flown following the 51-L Challenger accident. The video includes presentations by Gerald Smith (Solid Rocket Booster (SRB) Project Manager) and Joe Lombardo (Space Shuttle Main Engine (SSME) Project Manager) discussing the major changes that were made to the SRB and SSME between 51-L and STS-26. Mr. Smith's talk centered on the changes and redesigns made to the solid rocket motor field joint, the case to nozzle joint, the SRB aft skirt, and the ET aft attach ring. Mr. Lombardo discusses test data evaluation, SSME inspections and the SSME heat exchanger in particular.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1988-08-22. STS-26 Preflight Press Briefing: Shuttle Systems Changes (2). https://ntrs.nasa.gov/citations/20000012423

Cite the original work for its findings. Save a collection to share your selection of sources.