Search NASAโŒ• Search

NASA NTRS ยท 20000031615

STS-31: APU Controller Removal

Abstract

The launch April 10 of the STS-31 was scrubbed at T-4 minutes due to a faulty valve in auxiliary power unit (APU) number one. The auxiliary power unit is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter's hydraulic system. This video shows the removal of the STS-31's auxiliary power unit (APU).

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1990-04-11. STS-31: APU Controller Removal. https://ntrs.nasa.gov/citations/20000031615

Cite the original work for its findings. Save a collection to share your selection of sources.