Search NASAโŒ• Search

NASA NTRS ยท 20000044345

Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts: Program Cost Estimates - Volume 3

Abstract

The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Levack, Daniel J. H.. 2000-04-01. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts: Program Cost Estimates - Volume 3. https://ntrs.nasa.gov/citations/20000044345

Cite the original work for its findings. Save a collection to share your selection of sources.