Search NASASearch

NASA NTRS · 20000112880

In-Orbit Earth Radiation Budget Satellite (ERBS) Battery Switch

Abstract

A viewgraph presentation outlines the Earth Radiation Budget Satellite (ERBS) power system and battery history. ERBS spacecraft and battery cell failures are listed with the reasons for failure. The battery management decision and stabilization of the batteries is discussed. Present battery operations are shown to be successful.

Keep this discovery

BibTeXRIS

Ahmad, Anisa, Enciso, Marlon, Rao, Gopalakrishna. 2000-05-01. In-Orbit Earth Radiation Budget Satellite (ERBS) Battery Switch. https://ntrs.nasa.gov/citations/20000112880

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related discoveries

In-Orbit Earth Radiation Budget Satellite (ERBS) Battery Switch

This presentation reviews the history of the Earth Radiation Budget Satellite (ERBS) and the problems which were experienced with the batteries. After two cells shorted on the first Battery, the decision was made to take battery 1 of line in late 1992. This left the second battery supporting all loads. The second battery began to experience problems in 1998 into 1999. The decision was made to bring the first battery on line and take the second battery off line. The steps to switching the batteries are reviewed, and the results are discussed.

Ahmad, Anisa

Manned Lunar Landing Via Rendezvous

In any mission description, the vehicles, the flight profiles, and the astrionics hardware to im- plement the mission are all tightly interwoven things. A final result evolves only after many iterations to the solution are made. This paper will describe one of these iterations in the Saturn C-5 Earth Orbit Rendezvous approach to the Manned Lunar Landing Program. Since the iter- ation to be described in an nthone, there exists some basis for the hope that the perturbation from the final solution is small. This paper is not concerned with the landing itself, but only with those operations leading to injection of the space craft into the lunar trans- fer trajectory. However, as is to be expected, it is the target conditions which set the pace for the overall operation. The entire operation must be sized to culminate at a time and place which places the lunar target in an attainable position. The procedure would call for a burst of activity lasting over a relatively short time as compared to the long and extensive preparations leading up to it. The activity must be aimed at the opening of the lunar "launch window". Figure 1 illustrates the variation in the velocity increment required to launch a vehicle into a lunar transfer trajectory from a 485 kilometer earth orbit. The minima are at irregularly spaced intervals and are a func- tion of the inclination of the lunar and the earth satellite planes and of the position of the moon in its orbit around the earth (i. e. , the day of the month). In an operations analysis these spacings will influence the number of vehicles on the launch pad (primary and back-up) , their state of readi- ness, the firing rate, and also the flight profile to be chosen. Whether it is decided to go by "con- necting" or by "tanking" mode, the objective must be to get the spacecraft in the launch ready state at the opening of one of these launch windows. It may be desired that the first vehicle be capable of remaining in a functionally capable state even after bridging one or more of the gaps between the windows. This consideration will influence the design of the vehicles as well as the operational modes to be designed into the flight control hard- ware. For example, a sleep switch may be de- sirable from the standpoint of savings in battery we ight.

LUNAR LANDING

The 2004 NASA Aerospace Battery Workshop

Topics covered include: Super NiCd(TradeMark) Energy Storage for Gravity Probe-B Relativity Mission; Hubble Space Telescope 2004 Battery Update; The Development of Hermetically Sealed Aerospace Nickel-Metal Hydride Cell; Serial Charging Test on High Capacity Li-Ion Cells for the Orbiter Advanced Hydraulic Power System; Cell Equalization of Lithium-Ion Cells; The Long-Term Performance of Small-Cell Batteries Without Cell-Balancing Electronics; Identification and Treatment of Lithium Battery Cell Imbalance under Flight Conditions; Battery Control Boards for Li-Ion Batteries on Mars Exploration Rovers; Cell Over Voltage Protection and Balancing Circuit of the Lithium-Ion Battery; Lithium-Ion Battery Electronics for Aerospace Applications; Lithium-Ion Cell Charge Control Unit; Lithium Ion Battery Cell Bypass Circuit Test Results at the U.S. Naval Research Laboratory; High Capacity Battery Cell By-Pass Switches: High Current Pulse Testing of Lithium-Ion; Battery By-Pass Switches to Verify Their Ability to Withstand Short-Circuits; Incorporation of Physics-Based, Spatially-Resolved Battery Models into System Simulations; A Monte Carlo Model for Li-Ion Battery Life Projections; Thermal Behavior of Large Lithium-Ion Cells; Thermal Imaging of Aerospace Battery Cells; High Rate Designed 50 Ah Li-Ion Cell for LEO Applications; Evaluation of Corrosion Behavior in Aerospace Lithium-Ion Cells; Performance of AEA 80 Ah Battery Under GEO Profile; LEO Li-Ion Battery Testing; A Review of the Feasibility Investigation of Commercial Laminated Lithium-Ion Polymer Cells for Space Applications; Lithium-Ion Verification Test Program; Panasonic Small Cell Testing for AHPS; Lithium-Ion Small Cell Battery Shorting Study; Low-Earth-Orbit and Geosynchronous-Earth-Orbit Testing of 80 Ah Batteries under Real-Time Profiles; Update on Development of Lithium-Ion Cells for Space Applications at JAXA; Foreign Comparative Technology: Launch Vehicle Battery Cell Testing; 20V, 40 Ah Lithium Ion Polymer Battery for the Spacesuit; Low Temperature Life-Cycle Testing of a Lithium-Ion Battery for Low-Earth-Orbiting Spacecraft; and Evaluation of the Effects of DoD and Charge Rate on a LEO Optimized 50 Ah Li-Ion Aerospace Cell.

Source record