In 1986, NASA funded a project to modernize the NASA Ames Research Center Unitary Plan Wind Tunnels, including the replacement of obsolescent controls with a modern, automated distributed control system (DCS). The project effort on this system included an independent safety analysis (ISA) of the automation system. The purpose of the ISA was to evaluate the completeness of the hazard analyses which had already been performed on the Modernization Project. The ISA approach followed a tailoring of the risk assessment approach widely used on existing nuclear power plants. The tailoring of the nuclear industry oriented risk assessment approach to the automation system and its role in reliability-based design of the automation system is the subject of this paper.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Carroll, Carol W., Dunn, W., Doty, L., Frank, M. V., Hulet, M., Alvarez, Teresa. 1994-01-01. Reliability-Based Design of a Safety-Critical Automation System: A Case Study. https://ntrs.nasa.gov/citations/20010121546

Cite the original work for its findings. Save a collection to share your selection of sources.