NASA NTRS ยท 20020090721
Two Outs, Bottom of the Ninth
Abstract
It was eight months before launch when my second Flight Operations Team lead said he was leaving the project for another job. Six months earlier, the original lead had said he was leaving. I was stunned--but I remained confident that we would recover. I didn't expect to lose the second lead. After all, lightning is not supposed to strike twice in the same place. This time, with only eight months until launch, I was very much concerned. No, 'concerned' is probably too mild a word. Let's get it right: I was sweating. Losing a lead at any stage presents problems, but two losses within 6 months of each other can definitely shake the confidence of an inexperienced Flight Ops Team.
Keep this discovery
Explore connections, maps & timelines
Snow, Frank. 2002-10-01. Two Outs, Bottom of the Ninth. https://ntrs.nasa.gov/citations/20020090721
Cite the original work for its findings. Save a collection to share your selection of sources.