NASA NTRS ยท 20040040186
[Activities of System Studies and Simulation, Inc.]
Abstract
Contents include the following: 1. Launch Vehicle Interface Work Performed: a. S3 provided to KSC the new launch inclination targets needed for the April '04 launch date. 2. Prelaunch operations work performed: a. S3 updated the staffing plan for MSFC on-console personnel\during the Final Countdown prior to launch. 3. Software Assessment Work Performed: a. S3 evaluated and recommended approval for Program Control Board (PCB) proposed change 649 for ground software changes, as well as change 650 and 650A for Stored Program Commands. 4. Education and Public Outreach Work Performed: a. S3 continues to coordinate the effort for the design and fabrication of scale models of the GP-3 for use at the launch site, education forums, and management/technical briefings. S3 also prepared a Change Request for additional funds needed for fabrication of additional scale models. S3 drafted the planned uses of these models, including the possibility of participation in the Boston, MA showings of the traveling Einstein Exhibit. 5. Program Management Support Work Performed: a. S3 prepared the input for and closed three MSFC Centerwide Action Item Tracking Systems (CAITS) actions during this period.
Keep this discovery
Explore connections, maps & timelines
2004-02-14. [Activities of System Studies and Simulation, Inc.]. https://ntrs.nasa.gov/citations/20040040186
Cite the original work for its findings. Save a collection to share your selection of sources.