NASA NTRS ยท 20050082138
High Resolution Doppler Imager FY 2001,2002,2003 Operations and Algorithm Maintenance
Abstract
During the performance period of this grant HRDI (High Resolution Doppler Imager) operations remained nominal. The instrument has suffered no loss of scientific capability and operates whenever sufficient power is available. Generally, there are approximately 5-7 days per month when the power level is too low to permit observations. The daily latitude coverage for HRDI measurements in the mesosphere, lower thermosphere (MLT) region are shown.It shows that during the time of this grant, HRDI operations collected data at a rate comparable to that achieved during the UARS (Upper Atmosphere Research Satellite) prime mission (1991 -1995). Data collection emphasized MLT wind to support the validation efforts of the TIDI instrument on TIMED, therefore fulfilling one of the primary objectives of this phase of the UARS mission. Skinner et al., (2003) present a summary of the instrument performance during this period.
Keep this discovery
Explore connections, maps & timelines
Skinner, Wilbert. 2004-12-21. High Resolution Doppler Imager FY 2001,2002,2003 Operations and Algorithm Maintenance. https://ntrs.nasa.gov/citations/20050082138
Cite the original work for its findings. Save a collection to share your selection of sources.