Search NASASearch

NASA NTRS · 20060038408

Engineering Estimation Programs

Abstract

A collection of programs have been written to aid in the development of electronic designs.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Cox, B.. 1994-11-08. Engineering Estimation Programs. https://ntrs.nasa.gov/citations/20060038408

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

2012 NASA Cost Estimating Handbook Highlights

The major goal is to ensure that appropriate policy is adopted and that best practices are being developed, communicated, and used across the Agency. -- Accomplished by engaging the NASA Cost Estimating Community representatives in the update. Scheduled to be complete by the end of FY 2012. Document has been through 3 detailed reviews across NASA.

cost estimation

Cost Validation Using PRICE H

PRICE H was introduced into the JPL cost estimation tool set circa 2003. It became more available at JPL when IPAO funded the NASA-wide site license for all NASA centers. PRICE H was mainly used as one of the cost tools to validate proposal grassroots cost estimates. Program offices at JPL view PRICE H as an additional crosscheck to Team X (JPL Concurrent Engineering Design Center) estimates. PRICE H became widely accepted ca, 2007 at JPL when the program offices moved away from grassroots cost estimation for Step 1 proposals. PRICE H is now one of the key cost tools used for cost validation, cost trades, and independent cost estimates.

cost estimation

Rapid Cost Assessment of Space Mission Concepts Through Application of Complexity-Based Cost Indices

This slide presentation reviews the development of a rapid cost assessment models for evaluation of exploration missions through the application of complexity based cost indices. In Fall of 2004, NASA began developing 13 documents, known as "strategic roadmaps," intended to outline a strategy for space exploration over the next 30 years. The Third Strategic Roadmap, The Strategic Roadmap for Solar System Exploration, focused on strategy for robotic exploration of the Solar System. Development of the Strategic Roadmap for Solar System Exploration led to the investigation of a large variety of missions. However, the necessity of planning around scientific inquiry and budgetary constraints made it necessary for the roadmap development team to evaluate potential missions not only for scientific return but also cost. Performing detailed cost studies for each of the large number of missions was impractical given the time constraints involved and lack of detailed mission studies; so a method of rapid cost assessment was developed by us to allow preliminary analysis. It has been noted that there is a strong correlation between complexity and cost and schedule of planetary missions. While these correlations were made after missions had been built and flown (successfully or otherwise), it seemed likely that a similar approach could provide at least some relative cost ranking. Cost estimation relationships (CERs) have been developed based on subsystem design choices. These CERs required more detailed information than available, forcing the team to adopt a more high level approach. Costing by analogy has been developed for small satellites, however, planetary exploration missions provide such varying spacecraft requirements that there is a lack of adequately comparable missions that can be used for analogy.

cost estimation