NASA NTRS · 20090034329
Preliminary Cost Model for Space Telescopes
Abstract
Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. However, great care is required. Some space telescope cost models, such as those based only on mass, lack sufficient detail to support such analysis and may lead to inaccurate conclusions. Similarly, using ground based telescope models which include the dome cost will also lead to inaccurate conclusions. This paper reviews current and historical models. Then, based on data from 22 different NASA space telescopes, this paper tests those models and presents preliminary analysis of single and multi-variable space telescope cost models.
Keep this discovery
Explore connections, maps & timelines
Stahl, H. Philip, Prince, F. Andrew, Smart, Christian, Stephens, Kyle, Henrichs, Todd. 2009-08-02. Preliminary Cost Model for Space Telescopes. https://ntrs.nasa.gov/citations/20090034329
Cite the original work for its findings. Save a collection to share your selection of sources.