NASA NTRS ยท 20100015497
Project Interface Requirements Process Including Shuttle Lessons Learned
Abstract
Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings
Keep this discovery
Explore connections, maps & timelines
Bauch, Garland T.. 2010-01-01. Project Interface Requirements Process Including Shuttle Lessons Learned. https://ntrs.nasa.gov/citations/20100015497
Cite the original work for its findings. Save a collection to share your selection of sources.