NASA NTRS · 20100033272
Preliminary Multi-Variable Cost Model for Space Telescopes
Abstract
Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. This paper reviews the methodology used to develop space telescope cost models; summarizes recently published single variable models; and presents preliminary results for two and three variable cost models. Some of the findings are that increasing mass reduces cost; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and technology development as a function of time reduces cost at the rate of 50% per 17 years.
Keep this discovery
Explore connections, maps & timelines
Stahl, H. Philip, Hendrichs, Todd. 2010-06-27. Preliminary Multi-Variable Cost Model for Space Telescopes. https://ntrs.nasa.gov/citations/20100033272
Cite the original work for its findings. Save a collection to share your selection of sources.