NASA NTRS ยท 20100036240
A Statistical Project Control Tool for Engineering Managers
Abstract
This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.
Keep this discovery
Explore connections, maps & timelines
Bauch, Garland T.. 2001-08-16. A Statistical Project Control Tool for Engineering Managers. https://ntrs.nasa.gov/citations/20100036240
Cite the original work for its findings. Save a collection to share your selection of sources.