Agent-Based Simulations for Project Management

Abstract

Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

White, J. Chris, Sholtes, Robert M.. 2011-03-01. Agent-Based Simulations for Project Management. https://ntrs.nasa.gov/citations/20110012101

Cite the original work for its findings. Save a collection to share your selection of sources.