NASA NTRS · 20120004261
Wallops Low Elevation Link Analysis for the Constellation Launch/Ascent Links
Abstract
To execute the President's Vision for Space Exploration, the Constellation Program (CxP) was formed to build the next generation spacecraft Orion and launch vehicles Ares, to transport human and cargo to International Space Station (ISS), moon, and Mars. This paper focuses on the detailed link analysis for Orion/Ares s launch and ascent links with Wallops 11.3m antenna (1) Orion's Dissimilar Voice link: 10.24 Kbps, 2-way (2) Ares Developmental Flight Instrument link, 20 Mbps, downlink. Three launch trajectories are considered: TD7-E, F (Feb), and G (Aug). In certain launch scenarios, the critical events of main engine cutoff (MECO) and Separation occur during the low elevation regime of WFF s downrange -- less than 5 degree elevation angle. The goal of the study is to access if there is enough link margins for WFF to track the DV and DFI links.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Cheung, Keith, Ho, C., Kantak, A., Lee, C., Tye, R., Richards, E., Sham, C., Schlesinger, A., Barritt, B.. 2011-03-07. Wallops Low Elevation Link Analysis for the Constellation Launch/Ascent Links. https://ntrs.nasa.gov/citations/20120004261
Cite the original work for its findings. Save a collection to share your selection of sources.