Search NASAโŒ• Search

NASA NTRS ยท 20130014265

Mass Properties for Space Systems Standards Development

Abstract

Current Verbiage in S-120 Applies to Dry Mass. Mass Margin is difference between Required Mass and Predicted Mass. Performance Margin is difference between Predicted Performance and Required Performance. Performance estimates and corresponding margin should be based on Predicted Mass (and other inputs). Contractor Mass Margin reserved from Performance Margin. Remaining performance margin allocated according to mass partials. Compliance can be evaluated effectively by comparison of three areas (preferably on a single sheet). Basic and Predicted Mass (including historical trend). Aggregate potential changes (threats and opportunities) which gives Mass Forecast. Mass Maturity by category (Estimated/Calculated/Actual).

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Beech, Geoffrey. 2013-05-21. Mass Properties for Space Systems Standards Development. https://ntrs.nasa.gov/citations/20130014265

Cite the original work for its findings. Save a collection to share your selection of sources.