NASA NTRS · 20140006540
Prediction Interval Development for Wind-Tunnel Balance Check-Loading
Abstract
Results from the Facility Analysis Verification and Operational Reliability project revealed a critical gap in capability in ground-based aeronautics research applications. Without a standardized process for check-loading the wind-tunnel balance or the model system, the quality of the aerodynamic force data collected varied significantly between facilities. A prediction interval is required in order to confirm a check-loading. The prediction interval provides an expected upper and lower bound on balance load prediction at a given confidence level. A method has been developed which accounts for sources of variability due to calibration and check-load application. The prediction interval method of calculation and a case study demonstrating its use is provided. Validation of the methods is demonstrated for the case study based on the probability of capture of confirmation points.
Keep this discovery
Explore connections, maps & timelines
Landman, Drew, Toro, Kenneth G., Commo, Sean A., Lynn, Keith C.. 2014-05-19. Prediction Interval Development for Wind-Tunnel Balance Check-Loading. https://ntrs.nasa.gov/citations/20140006540
Cite the original work for its findings. Save a collection to share your selection of sources.