Search NASASearch

NASA NTRS · 20140008969

James Webb Space Telescope Initial Mid-Course Correction Monte Carlo Implementation using Task Parallelism

Abstract

The James Webb Space Telescope will be launched into a highly elliptical orbit that does not possess sufficient energy to achieve a proper Sun-Earth L2 libration point orbit. Three mid-course correction (MCC) maneuvers are planned to rectify the energy deficit: MCC-1a, MCC-1b, and MCC-2. To validate the propellant budget and trajectory design methods, a set of Monte Carlo analyses that incorporate MCC maneuver modeling and execution are employed. The first analysis focuses on the effects of launch vehicle injection errors on the magnitude of MCC-1a. The second on the spread of potential V based on the performance of the propulsion system as applied to all three MCC maneuvers. The final highlights the slight, but notable, contribution of the attitude thrusters during each MCC maneuver. Given the possible variations in these three scenarios, the trajectory design methods are determined to be robust to errors in the modeling of the flight system.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Petersen, Jeremy, Tichy, Jason, Wawrzyniak, Geoffrey, Richon, Karen. 2014-05-05. James Webb Space Telescope Initial Mid-Course Correction Monte Carlo Implementation using Task Parallelism. https://ntrs.nasa.gov/citations/20140008969

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

L2 Station Keeping Maneuver Strategy for the James Webb Space Telescope

The station-keeping plan for the James Webb Space Telescope is zero velocity in the x-component at the fourth successive crossing of the XZ plane of the rotation libration point frame. A differential corrector is employed to determine the necessary delta-v. Maneuvering along the position component of the stable eigenvector of the monodromy matrix produces a minimum delta-v solution. The techniques developed to determine the minimum maneuver direction in a full ephemeris model, along with strategies to cope with the attitude constraints imposed by the sunshield that prevents the ability to maneuver along the stable eigenvector, are examined in this study.

Libration Point Orbit

Solar Radiation Pressure Effects on the Orbital Motion at SEL2 for the James Webb Space Telescope

Due to James Webb Space Telescope’s large sunshield, which will always be facing the Sun to protect the observatory’s instruments, Solar Radiation Pressure (SRP) has an important effect on its orbital motion around SEL2. Moreover, SRP is highly dependent on the observatory’s attitude with respect to the Sun observatory line. This paper explores the impact of SRP for different attitude profiles on the size of a reference orbit.

Libration Point Orbit

James Webb Space Telescope Orbit Determination Analysis

The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-Earth/Moon L2 libration point, 1.5 million km away from Earth. This paper describes the results of an orbit determination (OD) analysis of the JWST mission emphasizing the challenges specific to this mission in various mission phases. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate OD solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cm/sec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.

Libration Point Orbit