UAS NAS IHITL Test Readiness Review (TRR)

Abstract

Requesting release of IHITL test readiness review (TRR) charts to ensure UAS-NAS project primary stakeholders, the Federal Aviation Administration through the RTCA special committee -228 and the Office of the Secretary of Defense Sense and Avoid Science and Research Panel, are well informed on the IHITL test plan and expected outcomes as they relate to their needs to safely fly UAS in the NAS.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Murphy, Jim, Brignola, Michael P., Rorie, Conrad, Santiago, Confesor, Guminsky, Mike, Cross, Ken. 2014-07-21. UAS NAS IHITL Test Readiness Review (TRR). https://ntrs.nasa.gov/citations/20140010863

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Flight Test Series 3: Flight Test Report

This document is a flight test report from the Operational perspective for Flight Test Series 3, a subpart of the Unmanned Aircraft System (UAS) Integration in the National Airspace System (NAS) project. Flight Test Series 3 testing began on June 15, 2015, and concluded on August 12, 2015. Participants included NASA Ames Research Center, NASA Armstrong Flight Research Center, NASA Glenn Research Center, NASA Langley Research center, General Atomics Aeronautical Systems, Inc., and Honeywell. Key stakeholders analyzed their System Under Test (SUT) in two distinct configurations. Configuration 1, known as Pairwise Encounters, was subdivided into two parts: 1a, involving a low-speed UAS ownship and intruder(s), and 1b, involving a high-speed surrogate ownship and intruder. Configuration 2, known as Full Mission, involved a surrogate ownship, live intruder(s), and integrated virtual traffic. Table 1 is a summary of flights for each configuration, with data collection flights highlighted in green. Section 2 and 3 of this report give an in-depth description of the flight test period, aircraft involved, flight crew, and mission team. Overall, Flight Test 3 gathered excellent data for each SUT. We attribute this successful outcome in large part from the experience that was acquired from the ACAS Xu SS flight test flown in December 2014. Configuration 1 was a tremendous success, thanks to the training, member participation, integration/testing, and in-depth analysis of the flight points. Although Configuration 2 flights were cancelled after 3 data collection flights due to various problems, the lessons learned from this will help the UAS in the NAS project move forward successfully in future flight phases.

Unmanned↗

UAS Integration in the NAS Project Test Site Kick-off Meeting

This briefing was presented during the Test Site Kick Off Meeting to discuss the contract awards for Task 1 and Task 2. This briefing covered a high level overview for contract deliverables, Task 1 - UAS Traffic Management and Task 2, Live Virtual Constructive Distributed Environment.

Unmanned↗