Search NASA⌕ Search

NASA NTRS · 20150022921

VIIRS On-Orbit Calibration and Performance Update

Abstract

The S-NPP VIIRS was launched on October 28, 2011 and activated on November 8, and then went through a series of intensive functional tests in order to establish the sensor's baseline characteristics and initial on-orbit performance. With the exception of large optical degradation in the NIR and SWIR spectral regions that is due to pre-launch mirror coating contamination, both the VIIRS instrument and its on-board calibrators continue to operate and function normally. With continuous dedicated effort, it is expected that most of the sensor calibration parameters will continue to meet their design requirements and that high quality data products will be continuously generated and used by the operational as well as research community.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Xiong, X., Butler, J., Chiang, K., Efremova, B., Fulbright, J., Lei, N., McIntire, J., Wang, Z.. 2014-07-13. VIIRS On-Orbit Calibration and Performance Update. https://ntrs.nasa.gov/citations/20150022921

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

On-Orbit Verification of GLM Navigation on GOES-16

The GOES-R flight project has developed the Image Navigation and Registration (INR) Performance Assessment Tool Set (IPATS) to perform independent INR evaluations of the optical instruments on the GOES-R series spacecraft. In this paper, we document the development of navigation (NAV) evaluation capabilities within IPATS for the Geostationary Lightning Mapper (GLM). We also discuss the post-processing quality filtering developed for GLM NAV, and present example results for several GLM datasets. Initial results suggest that GOES-16 GLM is compliant with navigation requirements.

On-Orbit↗