Search NASASearch

NASA NTRS · 20150023505

NEO Test Stand Analysis

Abstract

A project within SwampWorks is building a test stand to hold regolith to study how dust is ejected when exposed to the hot exhaust plume of a rocket engine. The test stand needs to be analyzed, finalized, and fabrication drawings generated to move forward. Modifications of the test stand assembly were made with Creo 2 modeling software. Structural analysis calculations were developed by hand to confirm if the structure will hold the expected loads while optimizing support positions. These calculations when iterated through MatLab demonstrated the optimized position of the vertical support to be 98'' from the far end of the stand. All remaining deflections were shown to be under the 0.6'' requirement and internal stresses to meet NASA Ground Support Equipment (GSE) Safety Standards. Though at the time of writing, fabrication drawings have yet to be generated, but are expected shortly after.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Pike, Cody J.. 2015-11-17. NEO Test Stand Analysis. https://ntrs.nasa.gov/citations/20150023505

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

NASA KSC Internship Experience & Project Report

As part of the Spring 2021 Engineering Student Trainee rotation with the National Aeronautics and Space Administration (NASA) through the Pathways program at Kennedy Space Center (KSC). I served under KSC’s Engineering directorate as a Pneumatics Engineering Intern for the Environmental and Life support Systems branch (NE-XF). During my Internship, I primarily supported the Exploration Ground Systems (EGS) program under the direct supervision of NE-XF Pneumatics Senior Engineer, Ruben Jaca, and NE-XF matrix supervisor, Stephen M. Anthony. I worked on the completion of a Pressure Vessel and Pressurized System (PVS) certification for a Payload Accommodation Subsystem (PAS) prototype. As part of the Pathways program, I was additionally exposed to various career and skill enhancement activities.

Internship

Pathfinder Lander Rover Recharge System, and MARCO POLO Controls and ACME Regolith Feed System Controls and Integration

This project stems from the Exploration, Research, and Technology Directorate (UB) Projects Division, and one of their main initiatives is the "Journey to Mars". Landing on the surface of Mars which is millions of miles away is an incredibly large challenge. The terrain is covered in boulders, deep canyons, volcanic mountains, and spotted with sand dunes. The robotic lander is a kind of spacecraft with multiple purposes. One purpose is to be the protective shell for the Martian rover and absorb the impact from the landing forces; another purpose is to be a place where the rovers can come back to, actively communicate with, and recharge their batteries from. Rovers have been instrumental to the Journey to Mars initiative. They have been performing key research on the terrain of the red planet, trying to unlock the mysteries of the land for over a decade. The rovers that will need charging will not all have the same kind of internal battery either. RASSOR batteries may differ from the PbAC batteries inside Red Rover's chassis. NASA has invested heavily in the exploration of the surface of Mars. A driving force behind further exploration is the need for a more efficient operation of Martian rovers. One way is to reduce the weight as much as possible to reduce power consumption given the same mission parameters. In order to reduce the mass of the rovers, power generation, communication, and sample analysis systems currently onboard Martian rovers can be moved to a stationary lander deck. Positioning these systems from the rover to the Lander deck allows a taskforce of smaller, lighter rovers to perform the same tasks currently performed by or planned for larger rovers. A major task in transferring these systems to a stationary lander deck is ensuring that power can be transferred to the rovers.

Internship