Search NASA⌕ Search

NASA NTRS · 20160000212

Linear Covariance Analysis For Proximity Operations Around Asteroid 2008 EV5

Abstract

The NASA initiative to collect an asteroid, the Asteroid Robotic Redirect Mission (ARRM), is currently investigating the option of retrieving a boulder from an asteroid, demonstrating planetary defense with an enhanced gravity tractor technique, and returning it to a lunar orbit. Techniques for accomplishing this are being investigated by the Satellite Servicing Capabilities Office (SSCO) at NASA GSFC in collaboration with JPL, NASA JSC, LaRC, and Draper Laboratory, Inc. Two critical phases of the mission are the descent to the boulder and the Enhanced Gravity Tractor demonstration. A linear covariance analysis is done for these phases to assess the feasibility of these concepts with the proposed design of the sensor and actuator suite of the Asteroid Redirect Vehicle (ARV). The sensor suite for this analysis includes a wide field of view camera, LiDAR, and an IMU. The proposed asteroid of interest is currently the C-type asteroid 2008 EV5, a carbonaceous chondrite that is of high interest to the scientific community. This paper presents an overview of the linear covariance analysis techniques and simulation tool, provides sensor and actuator models, and addresses the feasibility of descending to the surface of the asteroid within allocated requirements as well as the possibility of maintaining a halo orbit to demonstrate the Enhanced Gravity Tractor technique.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Wright, Cinnamon A., Bhatt, Sagar, Woffinden, David, Strube, Matthew, D'Souza, Chris. 2015-01-30. Linear Covariance Analysis For Proximity Operations Around Asteroid 2008 EV5. https://ntrs.nasa.gov/citations/20160000212

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Navigation of the Roman Space Telescope and the Space Weather Follow-On Missions – Strategies and Pre-Mission Analyses

NASA Goddard Space Flight Center (GSFC) is supporting two large-scale Lagrange-Point Orbiting missions set to launch in the next two years; Space Weather Follow On (SWFO-L1) in 2025 and Roman Space Telescope (RST) in 2026. SWFO-L1 will operate in a Sun-Earth L1 Lissajous orbit and RST will operate in a Sun-Earth L2 quasi-halo orbit. As with many NASA missions, the engineering challenges are as unique as the scientific objectives. The navigation systems for these missions must meet the specific, demanding, and evolving needs of both spacecraft.

Navigation↗

Navigation Filter Design Best Practices

Onboard navigation and attitude estimation systems are at the heart of almost all of NASA’s missions, either on launch vehicles, robotic science spacecraft, or on crewed human exploration vehicles. Best practices for attitude estimation systems/filters are scattered throughout open literature, however, even within NASA there has been no previous attempt to codify this knowledge into a readily available design handbook. Without such a document, it is possible for isolated practitioners to lack understanding and appreciation of many tried and true approaches to successful and robust filter design and the implied cost/benefit trades associated with them. To aid designers of current and future missions, a handbook of navigation filter best practices has been developed and is introduced here. The development of this document is also an outgrowth of a recommendation made in an NESC summary of lessons learned from the DARPA Orbital Express mission to utilize best practices for rendezvous navigation filter design. With this handbook, future designers have a reference that establishes NASA’s best practices.

Navigation↗

Seeker Free-Flying Inspector GNC System Overview

Seeker is an ultra-low cost approach to highly automated extravehicular inspection of crewed or uncrewed spacecraft that has been designed and built in-house at the NASA Johnson Space Center (JSC). The first version of Seeker is intended to be an incremental development towards an advanced inspection capability. This effort builds on past free-flying inspector development efforts such as the Autonomous Extravehicular Activity Robotic Camera Sprint (AERCam Sprint) and Mini AERCam. Seeker was funded as an International Space Station (ISS) "X-by" Project, which required delivery of the vehicle approximately one year after authority to proceed and within the budget of $1.8 million. Seeker will fly onboard the NG-11 Cygnus mission in 2019 and will deploy after Cygnus' primary mission is completed. Seeker will perform inspection-like maneuvers within 50 meters of the target vehicle (Cygnus) and then dispose itself. The Seeker Guidance, Navigation, and Control (GNC) system is composed entirely of commercial off-the-shelf (COTS) and space-rated COTS items, an inertial-relative Multiplicative Extended Kalman Filter (MEKF), point-to-point guidance (with various additional modes such as stationkeeping), proportional-integral translational control, phase plane rotational control, and a state machine for automated mission moding with minimal ground input.

Navigation↗