Search NASA⌕ Search

NASA NTRS · 20160000702

Structural Design Considerations for a 50 kW-Class Solar Array for NASA's Asteroid Redirect Mission

Abstract

NASA is planning an Asteroid Redirect Mission (ARM) to take place in the 2020s. To enable this multi-year mission, a 40 kW class solar electric propulsion (SEP) system powered by an advanced 50 kW class solar array will be required. Powered by the SEP module (SEPM), the ARM vehicle will travel to a large near-Earth asteroid, descend to its surface, capture a multi-metric ton (t) asteroid boulder, ascend from the surface and return to the Earth-moon system to ultimately place the ARM vehicle and its captured asteroid boulder into a stable distant orbit. During the years that follow, astronauts flying in the Orion multipurpose crew vehicle (MPCV) will dock with the ARM vehicle and conduct extra-vehicular activity (EVA) operations to explore and sample the asteroid boulder. This paper will review the top structural design considerations to successfully implement this 50 kW class solar array that must meet unprecedented performance levels. These considerations include beyond state-of-the-art metrics for specific mass, specific volume, deployed area, deployed solar array wing (SAW) keep in zone (KIZ), deployed strength and deployed frequency. Analytical and design results are presented that support definition of stowed KIZ and launch restraint interface definition. An offset boom is defined to meet the deployed SAW KIZ. The resulting parametric impact of the offset boom length on spacecraft moment of inertias and deployed SAW quasistatic and dynamic load cases are also presented. Load cases include ARM spacecraft thruster plume impingement, asteroid surface operations and Orion docking operations which drive the required SAW deployed strength and damping. The authors conclude that to support NASA's ARM power needs, an advanced SAW is required with mass performance better than 125 W/kg, stowed volume better than 40 kW/cu m, a deployed area of 200 sq m (100 sq m for each of two SAWs), a deployed SAW offset distance of nominally 3-4 m, a deployed SAW quasistatic strength of nominally 0.1 g in any direction, a deployed loading displacement under 2 m, a deployed fundamental frequency above 0.1 Hz and deployed damping of at least 1%. These parameters must be met on top of challenging mission environments and ground testing requirements unique to the ARM project.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kerslake, Thomas W., Kraft, Thomas G., Yim, John T., Le, Dzu K.. 2016-01-04. Structural Design Considerations for a 50 kW-Class Solar Array for NASA's Asteroid Redirect Mission. https://ntrs.nasa.gov/citations/20160000702

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Solar Electric Propulsion Concepts for Human Space Exploration

Advances in solar array and electric thruster technologies now offer the promise of new, very capable space transportation systems that will allow us to cost effectively explore the solar system. NASA has developed numerous solar electric propulsion spacecraft concepts with power levels ranging from tens to hundreds of kilowatts for robotic and piloted missions to asteroids and Mars. This paper describes nine electric and hybrid solar electric/chemical propulsion concepts developed over the last 5 years and discusses how they might be used for human exploration of the inner solar system.

solar arrays↗

ACO Dust Mitigation for Flexible Solar Arrays (DMFlex)

• Announcement of Collaborative Opportunity (ACO) with SSLMaxar • Purpose: • Evaluate blanket solar arrays with mechanical actuation for dust removal • Evaluate vibratory shaking and electrostatic methods for efficacy in simulated lunar environment • Goal is to develop dust mitigation for solar arrays • To maintain solar array operational capability over time • Avoid replacement costs • Extend mission durations

solar arrays↗