Underestimation of Project Costs

Abstract

Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Jones, Harry W.. 2015-07-12. Underestimation of Project Costs. https://ntrs.nasa.gov/citations/20160001191

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Rapid Turnaround of Costing/Designing of Space Missions Operations

The Ground Segment Team (GST), at NASA's Jet Propulsion Laboratory in Pasadena, California, provides high-level mission operations concepts and cost estimates for projects that are in the formulation phase. GST has developed a tool to track costs, assumptions, and mission requirements, and to rapidly turnaround estimates for mission operations, ground data systems, and tracking for deep space and near Earth missions. Estimates that would often take several weeks to generate are now generated in minutes through the use of an integrated suite of cost models. The models were developed through interviews with domain experts in areas of Mission Operations, including but not limited to: systems engineering, payload operations, tracking resources, mission planning, navigation, telemetry and command, and ground network infrastructure. Data collected during interviews were converted into parametric cost models and integrated into one tool suite. The tool has been used on a wide range of missions from small Earth orbiters, to flagship missions like Cassini. The tool is an aid to project managers and mission planners as they consider different scenarios during the proposal and early development stages of their missions. The tool is also used for gathering cost related requirements and assumptions and for conducting integrated analysis of multiple missions.

Cost estimation↗