NASA NTRS · 20160012503
Proposal to Accomplish Phase B Space Shuttle Program
Abstract
This proposal has been prepared in response to National Aeronautics and Space Administration Request for Proposal No. 10-8423, dated February 20, 1970, and Amendments No.1, 2, 3, & 4 thereto. It is firm for a period of not less than one hundred twenty (120) days from March 30, 1970. The executed certifications requested in Enclosures 5 and 6 of the Request for Proposal are appended at the end of this proposal. Grumman Aerospace Corporation, along with its associates -- the General Electric Company, Eastern Airlines, the Northrop Corporation, and the Aerojet-General Corporation -- are pleased to submit this proposal. This study must prove that technical challenges can be met at a cost commensurate with realistic national funding levels at an early date, (perferably prior to the late 1977 initial operating capability (IOC) indicated in the Statement of Work). We have assembled a team of extremely competent associates. Together, we are fully qualified to study all facets of the proposed Phase B study, and to develop and build the product. We believe we have already made a promising start toward defining the concept of the space shuttle system.
Keep this discovery
Explore connections, maps & timelines
Mead, Lawrence M., Gavin, Joseph G., Jr.. 1970-03-30. Proposal to Accomplish Phase B Space Shuttle Program. https://ntrs.nasa.gov/citations/20160012503
Cite the original work for its findings. Save a collection to share your selection of sources.