Spaceport Command and Control System Automation Testing

Abstract

The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administrations (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires high quality testing that will properly measure the capabilities of the system. Automating the test procedures would save the project time and money. Therefore, the Electrical Engineering Division at Kennedy Space Center (KSC) has recruited interns for the past two years to work alongside full-time engineers to develop these automated tests, as well as innovate upon the current automation process.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Hwang, Andrew. 2017-04-19. Spaceport Command and Control System Automation Testing. https://ntrs.nasa.gov/citations/20170004493

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part II: Thermal Analysis

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the multiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

Testing

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in mid-2020, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20 K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is an assessment of thermal model pre-test prediction performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. The insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Testing

Overview of the Acoustic Testing of the European Service Module Structural Test Article (E-STA)

The European Space Agency (ESA) and their prime contractor Airbus Defense Space (ADS) are developing the European Service Module (ESM) for integration and utilization with other modules of NASAs Orion Multi-Purpose Crew Vehicle. As part of this development, ESA, ADS, NASA and the Lockheed Martin Company performed a series of reverberant acoustic tests in April-May 2016 on the ESM Structural Test Article (E-STA), the mechanical mock-up of the ESM designated for mechanical tests. Testing the E-STA under acoustic qualification loads verifies whether it can successfully withstand the medium and high frequency mechanical environment occurring during the vehicles lift-off and atmospheric phases of flight. The testing occurred at the Reverberant Acoustic Test Facility (RATF) at the NASA Glenn Research Centers Plum Brook Station site in Sandusky, OH, USA. This highly successful acoustic test campaign excited the E-STA to acoustic test levels as high as 149.4 dB Overall Sound Pressure Level. This acoustic testing met all the ESA and ADSs test objectives, including establishingverifying the random vibration qualification test levels for numerous hardware components of the ESM, and qualifying the ESMs Solar Array Wing electrical power system. This paper will address the test objectives, the test articles configuration, the test instrumentation and excitation levels, the RATF site and capabilities, the series of acoustic tests performed, and the technical issues faced and overcome to result in a successful acoustic test campaign for the ESM. A discussion of several test results is also included.

Testing