Search NASA⌕ Search

NASA NTRS · 20170007318

GOES-R L1b Readiness Implementation and Management Plan

Abstract

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kunkee, David, Farley, Robert, Kwan, Betty, Walterscheid, Richard, Hecht, James, Claudepierre, Seth., De Luccia, Frank. 2017-07-27. GOES-R L1b Readiness Implementation and Management Plan. https://ntrs.nasa.gov/citations/20170007318

Cite the original work for its findings. Save a collection to share your selection of sources.