L’Ralph Integration and Testing

Abstract

This paper describes the plans, flows, key facilities, components and equipment necessary to fully integrate, functionally test, qualify and calibrate the L’Ralph instrument on the Lucy observatory. Lucy is currently in the final design and fabrication phase (phase C) of mission development. It is scheduled to launch out of Cape Canaveral, Florida, in October 2021. Lucy will be the first space mission to study the Trojan asteroids associated with Jupiter, that are thought to be remnants of the primordial material that formed the outer planets. Lucy will fly by and carry out remote sensing on six different Trojan asteroids. The mission takes its name from the fossilized human ancestor (called “Lucy” by her discoverers) whose skeleton provided unique insight into humanity's evolution. Likewise, the Lucy mission will revolutionize our knowledge of planetary origins and the formation of the solar system. L’Ralph is one of the instruments on Lucy and it is provided by the NASA Goddard Space Flight Center (GSFC). L’Ralph is a combined multi-band visible imager (the Multi-spectral Visible Imaging Camera, MVIC, 0.4-0.85 microns) and wedge-filter infrared spectrometer (Linear Etalon Imaging Spectral Array, LEISA, 1-3.6 microns). LEISA will allow the team to look for the absorption lines that serve as the fingerprints for different silicates, ices and organics that likely will be on the surface of the Trojan asteroids. MVIC will take color images of the Trojan asteroid targets, and help determine how active they are. This paper will focus on the Integration and Test (I&T) activities for L’Ralph while it is at the NASA GSFC. L’Ralph has two assemblies, the telescope detector assembly (TDA) and main electronics box (MEB). The TDA is a single telescope feeding two focal planes, MVIC and LEISA. L’Ralph integration consists of assembly and alignment of the telescope, electronics box integration, thermal systems integration and the final assembly and testing. This I&T phase will be followed by the L’Ralph calibration and characterization, environmental tests which include electromagnetic interference (EMI)/electromagnetic compatibility (EMC), vibration with sine sweep, acoustics, shock, thermal balance, thermal vacuum, mass properties and center of gravity determination. This paper will briefly discuss L’Ralph shipment and delivery to the spacecraft vendor for observatory level I&T as well as some launch preparation activities.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Susanna Petro, Teresa Null. 2021-03-06. L’Ralph Integration and Testing. https://ntrs.nasa.gov/citations/20205006847

Cite the original work for its findings. Save a collection to share your selection of sources.