NASA NTRS ยท 20210001643
Surveyor spacecraft automatic landing system
Abstract
The Surveyor Project achieved five successful lunar landings between 1966 and 1968, following an intensive five-year development effort. One of the many significant accomplishments made by Surveyor was the development and validation of the first-ever automated soft-landing system. This paper provides a historical and control aspects of the spacecraft's terminal descent system. Driving requirements and other important design considerations are described, along with the configuration and operational sequence of the actual flight system.
Keep this discovery
Explore connections, maps & timelines
Thurman, Sam W.. 2004-02-01. Surveyor spacecraft automatic landing system. https://ntrs.nasa.gov/citations/20210001643
Cite the original work for its findings. Save a collection to share your selection of sources.